Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/4/2022 - P11

Finance Committee - Agenda - 5/4/2022 - P11

By dnadmin on Sun, 11/06/2022 - 21:42
Document Date
Fri, 04/29/2022 - 14:39
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/04/2022 - 00:00
Page Number
11
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050420…

Gi Ani Ge €iw vw

eGtCeEec Tt mic

31 Will Street -— PO BOX 3654 — NASHUA, N.H. 03060
PH (603)886-0200 / FAX 886-0026 / EMAIL — www.gatecityelectric.com

PROPOSAL

1/12/2022

PROJECT: Nashua Police Station — Firing Range Lighting

SUBMIT TO: Turnstone Construction Co. — Jim Delisle

TEL. 603-769-7496
Email jdelisle@turnstonecorp.com

. Replace two existing double flood lights in front with one 4ft and one 8ft LED strip
light to increase lighting levels and lighting quality. Prep lights for future dimming

1 — Columbia #CSL4-LSCS LED 4FT LIGHT $110.00
1 - Columbia #CSL8-LSCS LED 8FT LIGHT $155.00
$30.00

70° - 18/2 shielded dimming cable back to console
1 — misc boxes, wire, connectors etc

7 — hours labor

$50,00
$85.00/hour = $595.00

Project cost $940.00

. Replace two existing double head flood lights in six rows with one 4ft and one
8ft LED strip light to increase lighting levels and lighting quality. Replace 3
existing dimmers with new 0-10volt LED dimmers and run new 18/2 shielded
cable from each fixture to new dimmers. dimming scheme shall remain as is

6 — Columbia #CSL4-LSCS LED 4FT LIGHTS $110.00ea = $660.00

6 — Columbia #CSL8-LSCS LED 8FT LIGHTS $155.00ea = $930.00
250'- 18/2 shielded cable $.43/ft = $108.00
3 — LED dimmer switches — Lutron#DVSTV $90.00ea = $270.00

1 - misc pipe, wire, boxes, etc = $300.00
$85.00/nr = $3,570.00

42 — hours labor
Project Cost $6,838.00

cont'd on page 2

Page Image
Finance Committee - Agenda - 5/4/2022 - P11

Footer menu

  • Contact