B = Desirable (second priority}: Programs/Projects which will benefit the community whose validity of planning and timing have
been established.
PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.LCc
REQUESTED RECOMMENDS
Division of Walnut St(Chestnut St/
B-1 Public Works Central St Oval
(Engineering) Improvements $ 33,460 $ 33,460
This project aims to reconfigure a portion of the downtown area to improve traffic flow, reduce speeds and improve
pedestrian access. Proposed work includes one-way street pairs of Factory St and West Pearl St and revising traffic
flows and/or directions on portions of W Hollis St, Central St, Chestnut St School St and High St. This request is for
design cost only.
Division of Infrastructure Improvements
B-1 Public Works Citywide
(Street Department) $ 500,000 $ 500,000
Citywide Infrastructure improvements include but are not limited to: sidewalk construction. and curbing replacement
and repairs, crosswalk repairs or construction, or replacement of existing drainage or sewer infrastructure. Design
work will be performed by the City Engineering Department and to the extent feasible the projects will be performed
through the Street Department's operations. Utilizing the Street Department's work force and equipment will reduce
the overall cost of the work.
TOTAL FY 2023 LONG-TERM "B" PROGRAMS: $ 533,460 $ 533,460