Customer Responsibilities
Provide timely access to plant for Milton CAT employees
Receive part deliveries ahead of services if necessary and stage in generator room
Maintain jacket water and cooling pumps
Maintain cooling system
Perform oil samples every 100 hours
Maintain coolant additives - as needed
Drain skid condensate bowls - daily
Controi Panel - inspect/Test - daily
Coolant Level - Check - daily
Electrical Connections — Check - daily
Engine Air Cleaner Service indicator - Inspect - daily
Engine Air Pre-cleaner - Check/Clean - daily
. Engine Oit Level - Check - daily
Fuel Filter Differential Pressure - Check - daily
Generator - Inspect - daily
Generator Load - Check - daily
Power Factor - Check - daily
Voltage and Frequency — Check - daily
Watk-Around Inspection - daily
YPNOVOZ ET KR KT Tam sop >S
Excluded Services
The following services are not included under this Agreement, and if provided, will result in
additional charges to Customer. MCAT is not obligated te perform excluded services, unless the
parties arrange for such services under a separate agreement.
A. Pipework repairs from the flange on the engine
B. Maintenance and testing synchronizing breakers, switchgear & electrical distribution
system
C. Site modifications or changes if unit needs to be repaired off-site
D. Regulatory permitting of any kind
E. Crane/rigging required to remove unit or components for repair if onsite trolley and service
elevator cannot accommodate or doesn’t exist. MCAT accepts no responsibility for collateral
damage, other than that described in the penalty clause.
F. All Services outside of the “scope of work” (these will be quoted at T&M rates if required)
G. EPA or DEP emissions testing
H. Plant water\treatment \coolant replacement
I. Any additional cost of repairs or maintenance required as a result of misuse, alteration or
interference with the Maintained Equipment by any party other than MCAT or MCAT
subcontractor