Exhibit A Scope of Work
The scope of this LTSA includes all parts, materials, equipment, consumables, and labor necessary
to complete all tasks in the scope of work this will ensure the safe and reliable operation of
the PGE.
Schedule Maintenance
Engine/ generator:
Planned Cogen maintenance (includes parts, labor, travel and freight) in accordance with the
Caterpillar Maintenance schedule "SEBU7572-09" and based upon 4380 average operating hours
per contractuat year:
A. All parts will be replaced per Caterpillar guidelines; Service intervals may be combined to
minimize downtime.
B. Service contract will include the following: (please refer to “SEBU7572-09”" for description of
each service).
C. Services will be performed in regular business hours
Service schedule below are described as per each engine
Engine #1 = KAROQ0959
Engine # 2 = KAR00960
Service Interval Based on 4380 hours NO. of Services
(parts and labor) Per Year
750 hours Service 18
3000 hour Service 4
8000 hour Service | _|
Oil Change 18 :
| Top End |
