Materials, Labor, Equipment and
1.1.3, 1.1.6, 1.5.1, 341, 3.5, 3.8.2, 3.8 3, 3.12, 3.13,
3.15.1, 4.2.6, 4.2.7,5.21,6.2.1,7.3.7,932,933,
9 §.1.3, 9.10.2, 10.212, 102.4,1421.1,142.12
Meats, Methods, Techniques, Sequences and
Procedures of Construction
3.3.1, 3.12.10, 4.2.2,4.2 7,942
Mechanic's Lien
2.1.2, 15.2.8
Mediation
8.3.1, 10.3.5, 10.3.6, 15 2.1, 19.2.5, 152.6, 15.3,
15.4.1
Minor Changes in the Work
LLL, 3.12.8, 4.2.8, 7.1, 7.4
MISCELLANEOUS PROVISIONS
13
Modifications, Definition of
1.1.1
Modifications to the Contract
L.11, 0.1.2, 3.11, 4.1.2,421,523,7,83 1,97,
10.3.2, 11.3.1
Mutual Responsibility
6.2
Nonconforming Work, Acceptance of
9.6.6, 9.9.3, 12.3
Nonconforming Work, Rejection and Correction of
2.3, 2.4, 3.5, 4.2.6,624,951,982,993, 9104,
12.2.1
Notice
22.1, 2.3, 2.4,3.2.4,3.3.1,3.7.2,3129,521,97,
9.10, 10.2.2, 11.1.3, 12.2.2.1, 13.3, 135.1, 1352,
14.1, 14.2, 15.2.8, 15.4.1
Notice, Written
2.3, 2.4, 3.3.1, 3.9.2, 3.12.9, 3.12.10, 5.2.1, 9.7, 9.10,
10.2.2, 10.3, 11.1.3, 11.3.6, 122.2.1, 13.3, 14,1528,
15.4.1
Notice of Claims
3.7.4, 10.2.8, 15.1.2, 15.4
Notice of Testing and Inspections
13.5.1, $3.5.2
Observations, Contractor's
3.2, 3.7.4
Occupancy
2.2.2, 9.6.6, 9.8, 11.3.1.5
Orders, Written
1.1.1, 2.3, 3.9 2, 7, 8.2.2, 11.3.9, 12.1, 12.2.2.1, 13.5.2,
14.3.1
OWNER
2
Owner, Definition of
2.1.1
Owner, tnformation and Services Required of the
2.1.2, 2.2, 3.2.2, 3.12.10, 6.1.3, 6.1.4, 62 5, 9.3.2,
9.6.1,9.6.4,992,9.10.3, 10.33, 11.2, 113,135),
13.5.2, 14.1.1.9, 14.1.4, 15.1.3
Owner's Authority
1.5, 2.1.1, 2.3, 2.4, 3.4.2, 3.8.1, 3.12.10, 3.14.2, 4.1.2,
4.1.3,4.24,4.29,5.21,5.24,54.1,61,63, 7.2.1,
73.1, 8.2.2, 8.3.1, 9.3.1, 9.3.2, 9.5.1,964,99 1,
9.10.2, 10.3.2, 11.1.3, 11.3.3, 113.10, 12.2.2, 123,
13.2.2, 14.3, 14.4, 15.2.7
Owner's Financial Capability
2.2.1, 13.2.2, 14.1.1.4
Owner’s Liability Insurance
11.2
Owner s Relationship with Subcontractors
1.1.2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 1422
Owner's Right to Carry Out the Work
2.4, 14.2.2
Owner’s Right to Clean Up
6.3
Owner's Right to Perform Construction and to
Award Separate Contracts
6.1
Owner's Right to Stop the Work
2.3
Owner’s Right to Suspend the Work
143
Owner’s Right to Terminate the Contract
14.2
Ownership and Use of Drawings, Specifications
and Other Instruments of Service
1.1.1, 1.1.6, 1.1.7, 1.5, 2.2.5, 3.2.2, 3.11,3.17,42.12,
53
Partial Occupancy or Use
9.6.6, 9.9, 11.3.1.5
Patching, Cutting and
3.14, 6.2.5
Patents
3.17
Payment, Applications for
4.2.5, 7.3.9, 9.2, 9.3, 9.4,9.5,963,9.7,985, 9101,
14.2,3, 14.2.4, 14.43
Payment, Certificates for
4.2.5,42.9, 9.3.3, 9.4,9.5,961,966,97,9 101,
9.10.3, 13.7, 14.1.1.3, 142.4
Payment, Failure of
9.5.13, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2
Payment, Final
4.2.1,4.2.9, 9.8.2, 9.10, 11.1.2, 1E1.3, 11.41, 123,
13.7, 14.2.4, 14.4.3
Payment Bond, Performance Bond and
7.3.7.4, 9.6.7, 9.10.3, 11.4
Payments, Progress
9 3, 9.6, 9.8.5, 9.103, 13.6, 14.2.3, 14.1.3
PAYMENTS AND COMPLETION
9
Payments to Subcontractors
5.4.2, 9.5.1.3, 9.6.2,96 3,964,967, 1421.2
PCB
10.3.1
tik AIA Document A201™ ~ 2007, Copyrighl © 1914, 1915, 1918, 1925. 1937, 1951, 1956, 1961, 1963. 1966. 1970. 1976, 1987, 1997 and 2007 by The American
’ Institute of Archilecis, All rights reserved. WARNING This AIA*® Document is protected by U.S. Copyright! Law and Inlernalional Treaties. Unauthorized 6
reproduction or distributlon of this AIA® Document, or any portion of it, may result In severe civil and criminal penatlies, and will be prosecuted to the
; maximum extent possible under the law. This document was produced by AIA software al 14:10 20 ET on 01/10/2020 under Order No 1403731939 which
expires on 09/22/2020. and is nal for resale
User Notes: (1145984853)