Contractor's Construction Schedules
3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2
Contractor’s Employees
3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 426, 10.2, 10.3,
H1.0.1, 11.3.7, 14.1, 14.2.1.1
Contractor’s Liability Insurance
11.1
Contractor’s Relationship with Separate Contractors
and Owner's Forces
3.12.5, 3.14.2, 4.2.4, 6, 11.3.7, 12.1.2, 12.2.4
Contractor’s Relationship with Subcontractors
1.2.2, 3.3.2, 3.18.1, 3.18.2, 5, 9.6.2, 9 6.7, 9.10.2,
11.3.4.2, 11.3.7, 11.3.8
Contractor’s Relationship with the Architect
1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 34.2, 3.5,
3.7.4, 3.10, 3.01, 3.12, 3.16, 3.18, 4.1.3, 4.2, $.2, 62.2,
7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 102.6, 103,
11.3.7, 12, 13.5, 15.1.2, 15.2.1
Contractor’s Representations
3.2.1, 3.2.2, 3.5, 3.12.6, 6.2.2, 8.2.1, 9.3.3,982
Contractor's Responsibility for Those Performing the
Work
3.3.2, 3.18, 5.3, 6.1.3, 6.2, 9.5.1, 10.2.8
Contractor's Review of Contract Documents
32
Contractor’s Right to Stop the Work
97
Contractor’s Right to Terminate the Contract
14.1, 15.1.6
Contractor’s Submittals
3,10, 3.01, 3.12.4, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2,
9.8.3, 9.9.1, 9.10.2, 9.10.3, 11.1.3, 114.2
Contractor’s Superintendent
3.9, 10.2.6
Contractor’s Supervision and Construction
Procedures
1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1 3, 6.2.4, 7.1.3,
7.3.5, 7.3.7, 8.2, 10, 12, 14, 15.1.3
Contractual Liability Insurance
11.1.1.8, 11.2
Coordination and Correlation
1.2, 3.2.1, 3.3.1, 3.10, 3.126, 6.$.3,62 1]
Copies Furnished of Drawings and Spectfications
1.5, 2.2.5, 3.11
Copyrights
1.5,3.17
Correction of Work
2.3, 2.4, 3.7.3, 9.4.2, 9.8.2, 9.83, 9.9.1, 12.1.2, 12.2
Correlation and Intent of the Contract Documents
12
Cost, Definition of
7.3.7
Costs
2.4, 3.2.4, 3.7.3, 3.8.2, 3.15.2, $.4.2, 6.1.1, 6.2.3,
7.3.3.3, 7.3.7, 7.3.8, 7.39, 9.10.2, 103 2, 10.3.6, 11.4,
12.1.2, 12.2.1, 12.2.4, 13.5, 14
Cutting and Patching
3.14, 6.2.5
Damage to Construction of Owner or Separate
Contractors
3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 11.1.1, 11.3,
12.2.4
Damage to the Work
3.14.2,9.9.1, 10.2 t 2,102.5, 10.4, 11.3.1, 1224
Damages, Ctatms for
3.2.4, 3.18, 6.1.1,83.3.95 1,967, 103.3, 11.1 1,
11.3.5, 11.3.7, 14.1.3, 14.2.4, 15.1.6
Damages for Delay
6.1.1, 8.3.3, 9.5.1.6, 9.7, 10.3.2
Date of Commencement of the Work. Definition of
$.1.2
Date of Substantial Completion, Definition of
8.1.3
Day, Definition of
8.1.4
Decisions of the Architect
3.7.4,42.6, 4.2.7,42.11,42 12,42 13, 152, 6.3,
73.7, 7.3.9, 8.1.3, 8.3.1, 9.2,94,95.1,984,99.1,
13.5.2, 14.2.2, 14.2.4, 15 1, 15.2
Dectsions to Withhbold Certification
9.4.1, 9.5, 9.7, 14.1.1.3
Defective or Nonconforming Work, Acceptance,
Rejection and Correction of
2.3, 2.4, 3.5, 4.2.6, 6.2.5,9.5.1,9.5 2,966, 98 2,
9.9.3,9.10.4, 12.2.1
Definitions
1.1, 2.1.1, 3.1.1, 3.5, 3.12 1, 3.12.2, 3.12.3, 4.11,
15.1.1, 5.t, 6.12, 7.2.1,731,81,9.1, 9.8 1
Delays and Extensions of Time
3.2, 3.7.4, 5.2.3, 7.2.1, 7.3 2, 7.4, 8.3, 9.5 1,97,
10.3.2, 10.4, 14.3.2, (5.1.5, 15.2.5
Disputes
6.3, 7.3.9, 15.1, 15.2
Documents and Samples at the Site
3.11
Drawings, Definition of
1.1.5
Drawings and Specifications, Use and Ownership of
3.11
Effective Date of Insurance
8.2.2, 11.1.2
Emergencies
10.4, 14.1.1.2, 15.1.4
Employees, Contractor's
3.3.2, 3.4.3, 3.8.1,39,3.182,423,426, 102,
10.3.3, 11.E-1, 11.3.7, 14.1, 14 2.1.1
Equipment, Labor, Matertals or
1.1.3, 1.1.6, 3.4, 3.8, 38.2, 3 83, 3.12, 3.13, 3.15 L,
42.6, 4.2.7, $.2.1, 6.2.1, 7.3.7, 9.3.2,93.3,95.1.3,
9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14212
Execution and Progress of the Work
1.4.3, 1.2.1, 1.2.2, 2.2.3, 22.5, 3.1,3.3.1,3.4.1,3.5,
AIA Document A201™ - 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1954, 1958, 1961, 1963, 1966, 1970 1976, 1987 1997 and 2007 by Tos American
Init. Insbtute of Architects. All rights reserved. WARNING: This AIA® Document Is protectad by US. Copyright Law and International Treaties. Unauthorized
reproduction or distribution of this AIA® Document. of any portion of it, may result In severe civil and criminal penallies, and will be prosecuted to Ine
! maximum sateni possible under the law. This documenl was produced by AIA software al 14 10 20 ET on 01/10/2020 under Order No 1403731939 which
expires on 09/22/2020, and is not for resale
User Notes: (1145984853)