§ 6.2.4 Costs paid or incurred by the Construction Manager for taxes, insurance, contributions, assessments and
benefits required by law or collective bargaining agreements and, for personnel not covered by such agreements
customary benefits such as sick leave, medical and heaith benefils, holidays, vacations and pensions, provided such
costs are based on wages and salaries included in the Cost of the Work under Sections 6.2.1 through 6.2.3
§ 6.2.5 Bonuses, profit sharing, incentive compensation and any other discretionary payments paid to anyone hired
by the Construction Manager or paid to any Subcontractor or vendor, with the Owner's prior approval
§ 6.3 Subcontract Costs
Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the
subcontracts.
§ 6.4 Costs of Materials and Equipment Incorporated in the Completed Construction
§ 6.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in
the completed construction.
§ 6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed to allow for
reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner's property at the
completion of the Work or, at the Owner's option, shall be sold by the Construction Manager Any amounts realized
from such sales shall be credited to the Owner as a deduction from the Cost of the Work
§ 6.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items
§ 6.5.1 Costs of transportation, storage, installation, maintenance, dismantling and removal of materials, supplies,
temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are
provided by the Construction Manager at the site and fully consumed in the performance of the Work Costs of
materials, supplies, temporary facilities, machinery, equipment and tools that are not fully consumed shall be based
on the cost or value of the item at the time it is first used on the Project site less the value of the item when It 1s n°
longer used at the Project site. Costs for items not fully consumed by the Construction Manager shall mean fair
market value,
§ 6.5.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned by
constniction workers that are provided by the Construction Manager at the site and costs of transportation,
instaltation, minor repairs, dismantling and removal. The total rental cost of any Construction Manager-owned iter
may not exceed the purchase price of any comparable item. Rates of Construction Manager-owned equipment and
quantities of equipment shall be subject to the Owner's prior approval.
§ 6.5.3 Costs of removal of debris from the site of the Work and ils proper and legal disposal.
§ 6.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and
parcel delivery charges, telephone service at the site and reasonable petty cash expenses of the site office.
§ 6.5.5 That portion of the reasonable expenses of the Construction Manager's supervisory or administralive
personnel inctirred while traveling in discharge of duties connected with the Work.
§ 6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the
Owner's prior approval.
§ 6.4 Miscellaneous Costs
§ 6.6.1 Premiums for that portion of insurance and bonds required by the Contract Documents that can be directly
attributed to this Contract. Self-insurance for either full or partial amounts of the coverages required by the Contract
Documents, with the Owner's prior approval.
§ 6.6.2 Sales, use or similar taxes imposed by a governmental! authority that are related to the Work and for which
the Construction Manager is liable.
AFA Document A133” - 2009 [formerly A121" CMe ~ 2003). Copynght © 1991, 2003 and 2009 by The Amenan inslilute of Architectt AH nghis reserved
The *Amencan Inslitule of Architects” “AIA.” the AIA Logo and “AIA Contract Documents” are reg slerad lrademarks and may nol b¢ used wiihout permission
This document was produced by AIA saltware at 11°15 33 ET on G5/04/2021 under Order No 4797552925 which expwes on 09/23/2021, is nol for resale 15
licensed for one Wme use only, and may only be used n accordance wilh the AIA Contract Dacumenis® Terms of Service To report copyright violations e-manl
copynght@aia.org
User Notes (3BSADAAE)