ALTERNATE CLUIMIP SUM PRICE: Difference in price to furnish and install Square D
Altivar G00 Series Variable Frequency Drives (Owner's Preference} O Add (1) Deduct
ML Included in Base Bid (if checked, indicate $0)
Zeer OQ Dollars and
LLCO C
ents
ie wor s O00
(Use figures}
ALTERNATE D LUMP SUM PRICE: Tie Into 7 signalized intersections on Amherst
Street from Somerset Parkway to Northwest Boulevard as specified in Section.27 00
00
I} cn a
Fen /-Sythnosand Seve
Aunal ca, Seven -five Dollars and SG 716.00
a wa
2“TO Cents s2 ~ .
(Use words) (Use figures}
ALTERNATE E LUMP SUM PRICE: Install 3,500 additional feet of fiber on Amherst
Street from Blackstone Drive to- Northwest Boulevard as specified In Section 27 00-00
AAMY-one thosord — Live
ln undted Dollars and
Cte . Cents WA $E9,00
(tse words) (Use figures)
ALTERNATE F LUMP SUM PRICE: Install fire communication wire at each pump
station location as specified in Section 27 00 00
Forts —Nine_thousard Cea
: f
Dollarsnd
TAU) Cents s4oSo.00
(Use words) (Use figures) SSS
BIDS will be compared based’ on Base Bid OR Base Bid plus Alternates In any: combination (Alternate A (including A-1 and
A-2}, Alternate 6, Alternate C, Alternate: D, Alternate E, Alternate F), whichever Is In the best interest of the City.
The BIDDER hereby certifies, by checking the: boxes below, that. the following documents are included with this BID:
| O DBE Subcontractor Utilization Form NH DES. Form #NHDES-W-09-059 (Formerly EPA Form: 6100-4),
g DBE Subcontractor Performance Forms NHDES-09-NHDES-W-09-058 (Formerly EPA Form 6100-3} Submit one
O
form for. each DBE subcontractor:
BIDDER’s. American: iron. and Steel acknowledgement.
All of these forms.are in the SRE Federal Provisions: Section .D of the-front-end documents.
Page 16 of 17