ALTERNATE BID ITEMS (IF AWARDED BY OWNER)
ALTERNATE A-L LUIMP SUM PRICE: Difference in prica to furnish and install
complete Gorman-Rupp Wastewater Submersible Pumps (Owner's Preference} as
shown on the Drawings f) Add © deduct
included In Base Bid {if checked, indicate $0}
Ze vw Dollars and
Z ww et QP Cents g OC > O
(Use words} (Use figures) SSS”
ALTERNATE A-2 LUMP SUM PRICE; Difference in price to furnish and install complete
Gorman-Rupp Wastewater Suction Lift Pumps (Owner's Preference) as shown on
the Drawings {7 Add ( Deduct
fl Included in @ase Bid (if checked, Indicate $0}
Z LD Dollars and
ZLLO Cents $ OO O
{Use words} (Use figures)
TOTAL ALTERNATE A LUMP SUM PRICE {Items A-2 and A-2)
Zab Dollars and
ZECO cents ; O,.00
{Use words} {Use figures)
ALTERNATE & LUMP SUM PRICE: Difference in price to furnish and install complete
Allen-Bradley Programmable Logic Controllers (Owner's Preference) as shown on
the Drawings C1 Add © Deduct
}& included in Base Bid (if checked, indicate $0}
Ze CO Dollars and
ZELO Cents § 0,00 __
{Use words) (Use figures}
Page 15 of 17