ALTERNATE CLUMP SUM PRICE: Difference in price to furnish and install Square D
Altivar 600 Series Variable Frequency Drives (Owner's Preference) CM Add C1 Deduct
ML included in Base Bid (if checked, indicate $0}
Ze OQ Dollars and
Ze (0 Cents :
(Use words} 5s D100
{Use figures}
ALTERNATE D LUMP SUM PRICE: Tie Into 7 signalized Intersections on Amherst
Street from Somerset Parkway to Northwest Boulevard as specified in Section 27 00
00
'
Pen -Siytnoulend Seven
hunartA Garry -Pwe Dollas and c C
. $ so. T TS {2 ©
LLCO) Cents ey te
(Use words} (Use figures)
ALTERNATE EF LUMP SUM PRICE: Install 3,500 additional feet of fiber on Amherst
Street from Glackstone Drive to Northwest Boulevard’ as specified in Section 27 00.00
awventy-one. thousand — frye.
lA arukecc Dollars and
Cae Cents Z\ Z\ Sev, ©
(Usa wards} ie Sigures}
ALTERNATE F LUMP SUM PRICE: Install fire communication wire at each pump
station location as specified in Section 27 00 00
Ports Nine thousand Cet
Dollarand
EAT cents 4050.00
{Use words} (Use figuess SSS
BIDS will be compared based’ on Base Bid OR Base Bid plus Alternates In any combination (Alternate A (including A-1 and
A-2), Alternate B, Aiterate C, Alternate D, Alternate &, Alternate F), whichever Is In the best interest of the City.
| The BIDDER hereby certifies, by.checking the. boxes below, that the following documents are included with this BID:
(1 | DBE Subcontractor Utilization Form NHDES. Form #NHDES-W-09-059 (Formerly EPA Form: 6100-4),
oO DBE Subcontractor Performance Forms NHDES-09-NHDES-W-09-058 (Formerly EPA Form 6100-3} Submit ane
a
form for each DBE subcontractor.
BIDDER’s American Iron and Stee! acknowledgement.
All of these forms are In the SRE Federal Provisions: Section:D of the front-end documents.
Page 26 af 17