ALTERNATE BID ITEMS {IF AWARDED BY OWNER)
ALTERNATE A-l LUMP SUM PRICE: Difference In prica to furnish and Install
complete Gorman-Rupp Wastewater Submersible Pumps (Qwner's Preference} as
shown on the Drawings
} included in Base Bld (if checked, indicate 80}
Ze Tw Dallars and
Z a et QO Cants
{Use words}
ALTERNATE A-2 LUMP SUM PRICE: Difference in price to furnish and install completa
Gorman-Rupp Wastewater Suction Lift Pumps (Qwner's Preference) as shown on
the Drawings
JAl Included in Basa Bid (if checked, Indicate $0)
Zz £{D Doliars and
ZLLO Cents
{Use words}
TOTAL ALTERNATE A LUIVIP SUM PRICE {Items A-2 and A-2)
A Add © Baduct
. O.00
{Use figures)
[i Add ( Deduct
,O,00
(Lise figures)
Zz AD Dollars and
ZELO Cents s 0,00
{Use words) (Use figures)
ALTERNATE 8 LUMP SUM PRICE: Difference in price to furnish and install complete
Allen-Bradley Programmable Logic Controllers (Owner's Preference) as shown on
the Drawings Cl Add (] Deduct
J&L included in Base Bid (if checked, indicate $0}
Ce [OO Dollars and
ZeLO Cents
(Use words}
0.00
{Use figures}
Page 15 of 17