WASH PRESS CHUTE MODIFICATIONS:
‘TASK DESCRIPTIONS Tr Jlsed
Principatin | Project Project Project Architectural) Structural | Structure! Electrical Admin, aajac SUBS Mark-
Charge Manager | Engineer | Engineer | Process CAD | Architect cap Engineer cap Engineer AD Engineer an Engineer Assistant | Manager |TOTALHOURS| NON-LABOR | SUBS COST LABOR TOTAL
Hourty $201.94 $187.53 $138.28 $105.49 $96.45 $150.70 $e7.al $158.24 $99.46 $138.66 $0.00 $261.25 $99.46 $19S.92 $99.46 $60.28 $204.95
A Preliminary Design WPC
1 Kk ot Meeting z a 4 10 $200 $1.35) $435:
E__ Wath Press Chute Tech Memo ‘ w fF Ea) «6 ’ 2 2 cy $9,531 99,5
| 3 Meet with Cry z 2 2 G $36
4 NUDES Coordination 2 2 2 €
a
Subtotals o a 20 20 24 16 8 2 ° ° Q ° 0 ° 0 a ° 102 $200) $0) $9 $12,361 $12,561)
B Final Design WPC
__—_—__
3__ 60% Design Oocuments & Cost Estimate i 4 D D 0 a OD D Ey $651] $6,71:
2 95% Design Documents & Cost Entimate 2 ‘ ; ‘ ‘ ‘ 6 ‘ 2 $5.13: $5,431
3 Final Plans, Tech Specs & Cost 2 2 5 a 4 4 4 4 R $3a65} $4s
o
°
Subtotals ° 6 10 Er] 16 a8 18 18 1B ° ° ° ° ° 0 ° ° 128 $400] $0) $o $15,509) $15;
2 Bidding WeC
“Allowance + 7 + 7 ry a 355: 355:
o
Subtotals ° o 1 t ° 1 a 1 ° ° 0 Q ° ° ° 0 ° ‘4 $9} $0) $583] $ssa]
TOTAL PROJECT HOURS o 1 aL as a 38 26 21 18 ° ° 0 ° 0 o 4 0 24 $600 $0 $0 $28,423] $29,023]
Total Labor $28,423
Nen-Labor $600
Subcontractor $0
Sub Markup $o
Total Fee $29,000
TOTAL ALL PROJECTS $78,300