ESTIMATED STAFF EFFORT (HOURS) AND COSTS
City of Nashua, NH
‘Wash Press Chute & Screenings Garage Odor Control
20928
SCREENING GARAGE ODOR CONTROL
TASK DESCRIPTIONS. WJleed
Principalin | Project Project Project Architectural | Structurel | Structural Electrical Admin, aAsac SUBS Mark.
Charge Manager | Engineer | Engineer | Process CAD | Architect cap £ngineer cap Engineer cap Engineer co Engineer Assistant | Menager [TOTAL HOURS] NON-LABOR | SUBS COST Ua LABOR TOTAL
Hourly Bitiing Rate] $201.94 $187.63 $1390.28 $105.49 $96.45 $250.70 $87.41 $150.24 $99.45 $138.56 $0.00 $262.25 $93.46 $295.91 $99.46 $60.28 $204.95
A Preliminary Design Odor Control
1 Kich off Mesting 2 4 4 4 cy
z ‘Screenings Garage BOD 4 s 6 6 z 2 20 a a z ti)
2 Meat with Cory 2 2 2 ‘
@_NHOES Coordination z 2 ‘
a
Subtotals 0 a 14 Ea 16 2 9 2 o 24 Q a 6 a o 4 o 102 $400] $0)
6 Final Design Odor Control
1 60% Design Documents & Cost Estimate 3 O 14 16 z . ¢ a Fy ¢ ‘ ¢ FJ 7 2 FrT)
2 95% Design Documents & Cost Estimate 2 4 iz 2 2 6 s iz 12 s ‘ a a 2 2 100
E] Final Plaas, Tech Specs & Cost 2 4 a LI 2 s 6 n 4 a 4 a é a z “
O
A
‘Subtotals 0 7 6 Ea 6 6 0 18 18 36 28 20 16 22 16 8 6 297 $600) $0
3 Gidding Oder Control
Allowance a 1 1 1 a $
o
Subtotals 0 1 1 1 ° ° 0 o ° 1 ° 0 f ° o 1 0 5 $0] $0]
TOTAL PROJECT HOURS 0 16 a1 $9 $2 8 ° 20 18 61 28 Ea) 16 26 26 13 6 404 $1,000 $a $0 $45,304) $49,304)
Totel Labor $48,304
Non-Labor $1,000
Subcontractor #9
Sub Markup $0
Total Fee $49,300