Action: Improve
wayfinding and increase
public awareness of
multimodal options.
Recommendation 1
Encourage use of the existing
and future network by helping
users navigate to their desired
destination with multi-lingual
wayfinding signs, QR codes,
creative paint treatments on
roads, maps.
Recommendation 2
Focus signage along and leading
to the Heritage Rail Trail, Mine
Falls Park, Countryside Drive, and
Groton Road.
Action: Close critical gaps
throughout the City’s
multimodal networks.
The Nashua Bicycle and
Pedestrian plan noted a general
lack of connectivity between
bicycle and pedestrian networks
and a need to focus on addressing
the lack of connectivity.
Recommendation 1
Focus new sidewalk construction
to connect to existing sidewalks
and near areas with high
pedestrian activity, such as
business districts.
Recommendation 2
Focus new bicycle facility
installation to connect to existing
trails and bike lanes.
Comprehensive Master Plan
Mobility and Transit
Recommendation 3
Address lack of connection on
Kinsley Street and Spit Brook
Road.
- Kinsley St: Sidewalks west
of Woodward Avenue and
plenty of space for at least a
bike lane if on-street parking
can be moved/pushed to side
streets
* Spit Brook Rd: Sidewalks
are missing from most of
the length on at least one
side, and lane-narrowing can
provide enough space for bike
facilities.
Action: Promote
physical exercise,
walking, biking, and
public transit through
built environment
improvements.
167