EXHIBIT B
QO Stantec Stantec Consulting Services Inc.
45 Network Drive 3” Foor, Burlington MA 01803-4511
May 4, 2022
Mark Saunders, P.E
Senior Engineer
9 Riverside Greet
Nashua, NH 03062
Reference: 3-Year Optional Pavement Management Support Services Proposal
Dear Mr. Saunders:
Per your request, Santec Consulting Services, Inc. (Santec) has prepared the following
Pavement Management Services Proposal to ensure and protect the City’s municipal
pavement management system investment with providing system maintenance services
to maintain the City'spavement management database system.
We hereby propose to maintain the City’s Cartegraph pavement management system
(PMS) in Cartegraph’s Navigator, Santec will update work history, conduct pavement
conditions surveys, and perform data modeling and analysis on behalf of the City.
Stantec will maintain the City's pavement management database and provide exports
compatible with your GIS
Below are specific work tasks proposed to support Nashua in continuing their pro-active
approach to managing itspavement assets. The intent of these tasks willbe to update
the City’s pavement management database on an annual basis by utilizing ongoing
asset facility distress surveys, conduct data analysis for future capital improvement
planning and monitor system-wide metricson Nashua’ sroadways.
WORK TASKS:
Pavement Management System Update:
Stantec will annually re-survey 33% of the City’s roadway network, approximately
101 centerline miles each year to update the pavement surface condition (PCI)
ratings using CartéGraph’s PAVEMENTiew®Plus software. No data will be
collected on indices other than pavement condition. For each pavement
segment, Santec will capture a digital picture image to develop a geo-tagged
GlSlayer.
After field work, Santec will adjust system default deterioration curves based on
review of past Nashua PCI inspections and Stantec experience outside of
Nashua. Santec will enter and update new work history repair records for the
past construction season, update distress inspection records, and conduct
modeling and analysis of upcoming fiscal year roadway repair plan. This service
includes attendance at one (1) meeting at Nashua DPW, a written annual
summary describing Nashua’spavement condition network, financial needs, and
GlSdata shapefile export.
Stantec will discuss and develop a flow-work plan with Nashua to migrate data
over to OMSand conduct future pavement surveysutilizing Cartegraph’sOMS