Cte an
Cel(Lce Ce TT TRS Ce
31 Will Street - PO BOX 3554 —- NASHUA, N.H. 03060
PH (603)886-0200 / FAX 886-0025 / EMAIL — www.gatecityelectric.com
DATE:
PROPOSAL
1/12/2022
PROJECT: Nashua Police Station ~ Firing Range Lighting
SUBMIT TO: Turnstone Construction Co. — Jim Delisle
TEL. 603-769-7496
Email jdelisle@turnstonecorp.com
1.
Replace two existing double flood lights in front with one 4ft and one 8ft LED strip
light to increase lighting levels and lighting quality. Prep lights for future dimming
1 — Columbia #CSL4-LSCS LED 4FT LIGHT $110.00
1 — Columbia #CSL8-LSCS LED 8FT LIGHT $155.00
70’ - 18/2 shielded dimming cable back to console $30.00
1 — misc boxes, wire, connectors etc $50.00
7 —hours labor $85.00/hour = $595.00
aa
Project cost $940.00 — /o¢ Lust oud
Replace two existing double head flood lights in six rows with one 4ft and one
8ft LED strip light to increase lighting levels and lighting quality. Replace 3
existing dimmers with new 0-10volt LED dimmers and run new 18/2 shielded
cable from each fixture to new dimmers. dimming scheme shall remain as is
6 ~ Columbia #CSL4-LSCS LED 4FT LIGHTS $110.00ea = $660.00
6 — Columbia #CSL8-LSCS LED 8FTLIGHTS $155.00ea = $930.00
250’- 18/2 shielded cable $.43/ft = $108.00
3— LED dimmer switches — Lutron#DVSTV $90.00ea = $270.00
1— misc pipe, wire, boxes, etc = $300.00
42 — hours labor $85.00/hr = $3,570.00
Project Cost $5,838.00
—_—_—_———s
OO
cont'd on page 2
a