vf B"
B = Desirable (second priority)! Programs/Projects which benefit the community whose validity of planning and timing have
been established.
PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C
REQUESTED RECOMMENDS
Community
B-1 Development Railroad Square CMAQ
Division Project $ 299,999 $ 299,999
The purpose of this project is to improve circulation around Railroad Square and at the Main St/Canal St/Franklin St
intersection to accommodate increased traffic converging from Franklin St and Canal St on to the Main St.
intersection. The improvements also include upgrades to pedestrian and bicycle infrastructure to improve safety.
The total project cost is $1,499,999, with the City 20% match of $299,999.
Division of Truck Wash Bay
B-1 Public Works
(Street Department) $ 1,080,000 $ 1,080,000
The construction of the truck and chassis wash bay will extend the life of the city vehicles. Currently we have a pressure
washer that does not remove the salt residue from the undercarriage of the vehicles. A thorough wash after working
in winter conditions will help to ensure the fleet is maintained at a higher level and will last much longer.
B-1 Fire Department Priority One — Fire/IT Facilities
Safety and Security Video $ 80,000 $ 80,000
Adding Video Security to all 7 facilities to assist in the safety of all personnel and City property 24/7
B-1 Police Department Parking Lot Repaving $ 338,169 $ 338,169
Project to include remove the existing pavement, grade and compact the existing underlying material. Install a 2”
binder course and 1 %” top course and adding one or two catch basins with 300 feet of pipe, granite curbing to be reset
and parking lines to be installed. The current parking has exceeded the anticipated life expectancy; the life expectancy
of the new paving is in excess of 10 years.
19
