ORDINANCE
(g)
(h)
@)
(k)
()
(m)
(n)
(0)
(p}
(q)
()
O-21-045
Track lighting (each 10 feet): $6-$8.
Motor control centers (each), automatic transfer switches Ceach),
wiring of HVAC units (per unit): $32-$35.
Water heaters (each): $12-$15.
Electric baseboard heat (per unit): $8-$10.
Buss ducts (each section): $40-$15.
Transformers, generators, motors, x-ray machines (each): $22-$25
Paging and sound systems:
[1] Per speaker: $3-35.
[2] Per console: $22-$25.
Signs (each): $32,-$35.
Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section:
335-340.
Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.
Surcharge for permits issued after construction started without a
permit: 100% of applicable fee, but not to exceed $500-$750.
Annual permit fee: $250-$300.
[1] In lieu of an individual permit for each alteration to an
already approved electrical installation, the Code Official
shall issue an annual permit, upon application therefor, to
any person, firm or corporation regularly employing one or
more certified electricians in the building, structure or on
the premises owned or operated by the applicant for the
permit.
[2] Annual records. The person to whom an annual permit is
issued shall keep a detailed record of all alterations to an
approved electrical installation made under such annual
permit, and such records shall be accessible to the Code
Official at all times or shall be filed with the Code Official
as designated.
