ORDINANCE
(2)
O-21-045
(f) Adding or relocating meter(s): $50-$55.
(g) Pools (in-ground): $58-$60.
(h) | Temporary service (each): $45-$50.
(i) Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section:
$35-$40.
(i) Low voltage wiring (per square feet of work area): $0,080.
(kK) Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.
s}(1) Surcharge for permits issued after construction started without a
permit: 100% of applicable fee, but not to exceed $275.
Commercial electrical (including multifamily).
(a)
(b)
(c)
(d)
(e)
ca)
Nonrefundable application processing and review fee: $39-$50.
Electrical service entrance and service change (per amp): $0:40-
$0.50.
Temporary service (each): $45-$50.
Panels and subpanels (each): $25-$30.
Outlets:
[1] For switches, receptacles, and fire and smoke detectors
(each): $9-95-$ 1.
[2] For lighting and lighting fixtures, except as otherwise
provided (each four feet of continuous fluorescent lighting
shall be deemed a separate lighting fixture) (each): $6-95-
$l.
[3] For ranges, dryers, and similar heating devices (each): $8-
$15.
[4] For high-intensity lighting and fixtures (each) (250 watt
and above): $40-$15.
Fixed multi-outlet receptacle assemblies (for each six feet): $6-$8.
