Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 3/1/2021 - P15

Board Of Aldermen - Agenda - 3/1/2021 - P15

By dnadmin on Mon, 11/07/2022 - 06:58
Document Date
Tue, 02/23/2021 - 13:58
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Mon, 03/01/2021 - 00:00
Page Number
15
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030120…

ORDINANCE

(c)

(d)

Q-21-045

[1] Gas supply piping (base fee downstream of meter or
regulator set; test witnessed)-eaeh}: $0.30 per 1,000 BTUs.

34/2] Installation of fuel oil or propane storage tanks less than
499 gallons, fuel oil (each): $45- $30.

[3] Dormant Gas meter $45.

Equipment:

[i] Furnace, HRV/ERV., boiler or water heater: $49; $45.
[2] Water heater: $15-Generator including gas piping: $45.

[3]

>

$15-Ductless split system: $40.

[4] Boiler water or steam: $40 Hot water storage tank: $20.

[5] Beier water or steam, with domestic hot water senerator

$45. Air conditioner coiler or condenser: $20,

> 7 7 3 &
[$4[6] Dryer, eExhaust or ventilation fan (each): $6- $12.
fOl[7] Basebeardtoopteach}-$10-Room heater or gas appliance:
$30.

Weed er Gas or wood factory fireplace, insert, or pellet stove and
associated chimney: $40- $45.

e tyuilt feo! | iated-chimney. tid Seal

((c) Masonry fireplace and associated chimney: $75.

(=}(f} Manufactured chimney erchimneytiner: $30. 340.

Page Image
Board Of Aldermen - Agenda - 3/1/2021 - P15

Footer menu

  • Contact