Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 3/1/2021 - P14

Board Of Aldermen - Agenda - 3/1/2021 - P14

By dnadmin on Mon, 11/07/2022 - 06:58
Document Date
Tue, 02/23/2021 - 13:58
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Mon, 03/01/2021 - 00:00
Page Number
14
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030120…

ORDINANCE

(8)
(9)

(10)

(14)

(12)

(13)

(14)

(15)

O-21-045

Certificate of Occupancy, existing space/owner change: $50.

Special-constructien When, in the Building Official's opinion, the nature
of the work is not related to floor area, notinehuding excluding signs, but
including and not limited to membrane structures, temporary structures,
canopies and awnings, pedestrian walkways, radio and television towers,
radio and television antennas, elevators, commercial solar energy systems,
commercial wind energy systems and commercial (other than asphalt
roofing shingles) re-roofing:

(a) Fee shall be based on a construction or installation cost of $6.60
$0.65 per $100.

Retaining walls over four feet in height above grade base of footing:

(a) Residential: minimum $25 or $0-6 $0.15 per linear foot
(whichever is greater).

(b) Commercial: minimum $50 or $0.25 $0.30 per linear foot
(whichever is greater).

Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section [for
example: residential antennas, small sheds (less than 200 square feet), or
construction trailers] or as deemed appropriate by the Building Official or
his or her designee:

(a) Residential: $29- $30.
(b) Commercial: $45, $50.

Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Phased construction (foundation permits, interior demolition permits or
shell permits): Phased construction shall be charged a 25% surcharge on
the original permit fee for each upgrade phase.

Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $275 Residential / $500 $750
Commercial.

Expedite-service fee for special processing and after-hours service: $75
$80 per hour per staff member, with a minimum of $290 $250 for
weekends or time not contiguous with normal work hours.

B. Mechanical permit fee schedule.

(1)

Residential mechanical (one- & two-family and townhouses).

(a) Nonrefundable application processing and review fee: $34. $50

(b) Delivery system:

Page Image
Board Of Aldermen - Agenda - 3/1/2021 - P14

Footer menu

  • Contact