Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 1/5/2022 - P31

Finance Committee - Agenda - 1/5/2022 - P31

By dnadmin on Sun, 11/06/2022 - 21:39
Document Date
Thu, 12/30/2021 - 13:43
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/05/2022 - 00:00
Page Number
31
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010520…

SANBORN HEAD 20 Foundry Street

Building Trust. Engineering Success. Concord, NH 03301

Mr. Jeff Lafleur April 7, 2021
Solid Waste Superintendent

Nashua Division of Public Works, Solid Waste Department

840 West Hollis Street

Nashua, NH 03062

Re: — Revised Proposal for Design and Permitting Services
Phase III Stage 2
Four Hills Landfill
Nashua, New Hampshire

Dear Jeff:

Sanborn, Head & Associates, Inc. (Sanborn Head) is pleased to provide the City of Nashua
(City) with this proposal to provide design and permitting services associated with the Phase
II] Stage 2 expansion at the Four Hills Landfill in Nashua, New Hampshire. As you are aware,
the City received permit approval for Phase II] on December 5, 2018 from the New
Hampshire Department of Environmental Services (NHDES). The approval included several
conditions related to Stages 1 and 2 of the proposed design. Sanborn Head worked with the
City to meet the Stage 1-specific permit conditions to complete construction and obtain
operating approval of the new phase. Now that Stage 1 is operational, the City requested that
Sanborn Head prepare a proposal to satisfy the Stage 2 conditions.

For clarity, the permit conditions included in the December 5, 2018 NHDES approval letter
specific to the design and permitting of Phase II] Stage 2 are reproduced below:

(10) Prior to filing the notice of intent to construct for Phase III Stage 2, the permittee shall
obtain approval from NHDES of final design plans submitted in accordance with Env-Sw 315.
The final design plans shall be prepared based on the approved preliminary plans identified in
Condition (7)(a), with the following changes and additional information:
(a) Revised design calculations, and construction documents as appropriate, for the
zigzag liner anchor trench design based on ultimate settlement;
(b) Revised construction documents to include the following:
1. Design details for transition from the zigzag liner to Phase II; and
2. Design details and other construction drawings as needed to show how the
zigzag liner system and associated landfill components will be constructed at the
reflex angles between Phase II and Phase III.
(c) A zigzag liner inspection, monitoring and maintenance plan, to be appended to both
the operating plan and closure plan in accordance with Conditions (18) and (19) herein,
that includes:
1. Protection protocols during construction and filling operations;
2. Inspection and testing protocols prior to causing any part of the zigzag liner
system to become inaccessible for inspection and repair;