Shipment:
Validity:
Terms:
Payment:
Freight:
Piping, Valves, Temperature or Pressure Gauges
insulation
Anchor bolts
Taxes, Bonds
Unloading at job-site
installation
22 Weeks after receipt of approved drawings. Approval drawings shall be submitted
5 weeks ARO. If shorter lead time is needed, please call to discuss
Price is valid for 30 days
We propose to use the same terms and conditions that were negotiated for the
previous PO (PO# 130838 from 2016).
100% at shipment, Net 30 days from invoice.
FOB Jobsite. Freight is included in price.
Thank you for this opportunity to provide our proposal for this project. Please feel free to contact me
at the number shown below should you have any questions.
Best Regards,
Michelle Peel
Alfa Laval, Inc.
Energy Division Sales Engineer
Ph: 804-545-8319
E-Mail: michelle.peel@alfalaval.com
Classified by Alfa Laval as: Business