change order or the fully executed OWNER Purchase Order shall control over the terms of the
Proposals
ARTICLE 2— WORK TO BE PERFORMED
Except as otherwise provided in this contract, CONTRACTOR shall furnish all services, equipment,
and materials and shall perform all operations necessary and required to carry out and perform in
accordance with the terms and conditions of the contract the work described.
All applicable permitting to be secured by contractor or sub-contractor prior to commencement of
work at 11 Riverside St., Nashua, NH 03062
Description of Work:
e Prepare a preliminary plan of work required for review with the city team including Building.
Safety, Facilities and Plumbing Inspection. A stamped plumbing plan will be provided.
Remove finish flooring as needed in Kitchen, toilet rooms and hallway.
Remove asphalt sidewalk and excavate down to sewer connection.
Scan, Sawcut, Vac and remove concrete off site.
Remove interior drywall as needed to access plumbing lines.
Hand Excavate for new sewer piping.
Remove fixtures and save for reinstallation.
Remove 4” cast iron waste piping for the interior bathrooms to the exterior sewer connection
with approximately 80 linear feet of underground Schedule 40 PVC 4” piping that will be
reconnected to existing venting. (Per code: All PVC plumbing passing through concrete
footings or foundations shall include a relief arch or sleeve.)
e Backfill with sand and crushed stone to support the new pipe.
e Replace concrete floors to match existing.
e Replace floor finishes to match existing as close as possible. In Toilet Rooms, all sheet vinyl.
flooring and base will be replaced. VCT in hallway and Ceramic Tile in kitchen will be
patched.
Replace interior drywall structures as needed.
Paint interior walls as needed corner to corner on affected walls.
Replace asphalt sidewalk as needed. This will be a patch, not the entire walk.
Complete all inspections for project per permits, including Final Inspections.
ARTICLE 3 — PERIOD OF PERFORMANCE
CONTRACTOR shall perform and complete all work by May 31,2022 _ which date shall only be
altered by mutually approved written agreement to extend the period of performance or by termination
in accordance with the terms of the contract. CONTRACTOR shall begin performance upon receipt
of an Executed Contract and a valid Purchase Order issued from the City of Nashua.
ARTICLE 4— CONTRACT SUM
Subject to additions and deductions by Change Order, the OWNER shall pay CONTRACTOR, in
accordance with the Contract Documents, the Contract Sum of:
($ 98,366.00) Dollars