Nashua Downtown Riverfront Project Lead Consultant Team Members are Hig for Each Task
Lumen Fitzmeyer &
Studios Tecci
VHB Halvorson Hi Tumer TOTALS
Phase 2 - Schematic Design (Preliminary Plans)
2.1 Schematic (P Plans}
244 Initiate Phase 2 $71,100!
2.12 Preliminary Design Plan development
Factory St. Extension Ped Access to
Pine Street
nofF St Extension $3
Parc de Renaissance and Water and $8,000. $57,500:
4 Water St Boardwalk $1,100.00
Renovation to Bicentennial Park - $0.00
53 Main St Cantilevered Boardwalk $1,800.06
Miulttuse Path $4,300.00
Substation $0.00
Boardwalk and Floa Dock $3,200.00
Trail $13,850
Riverbank Restoration $0.00
Cotton Transfer ADA $33,506.0
BAE Trail and Parking Modifications $13,000. §13,000.0
PanAm Ped Walkway Rehabilitation $30,370. §30,37
South Side Trail nts 00
ADA Ram $16,380
60 Main Street Boardwalk and Trail $10 $13,000.
Pearson Ave Alternative Connection : $0.00 $0.00
Preli ale : 0.00 $0,600
$15,000.00
to Final $0.00 $9.00
Utility Coordination $1,800.00 $1,800.00
Owner Coordination $1,500. $1,500.
Env, T:
Public & Stakeholder
Meeti eam and Staff)
Preliminary Cost
ement
hei cal Minor $3,000.00
Reimbursable Expenses {lf $1,000.00
Park Pavilion Architectural
PHASE 2 SUBTOTALS= | $189,300.00 000.00 I $41 0.00
5% SUBCONSULTANT ADMIN FEES (WAIVED)= $0.00
Other Expenses and Allowances:
Geotechnical for 2 Ped Ramp Structures: $18,000.00 $18,000.00
Geotechnical for In-Water Structures: $50,000.00 $50,000.00
Point Cloud Building Face Surveys: $7,000.00 $7,000.00
PanAm Inspection Vehicle: $3,500.00 $3,500.00
PanAm RR insurance {Allowance} $5,000.08 $5,000.00
Irrigation Design and Engineering: (DELETED) $0.06
Horticultural Soils Consultant: (DELETED} $0.00
TOTAL OF OTHER EXPENSES AND ALLOWANCES: $83,500.00
PHASE 2 TOTALS = $222,800.00 $89,700.00 $140,000.00 $3,000.00 $2,000.00 $500,000.60