Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 8/11/2020 - P106

Board Of Aldermen - Agenda - 8/11/2020 - P106

By dnadmin on Sun, 11/06/2022 - 23:06
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
106
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

Nashua Downtown Riverfront Project Lead Consultant Team Members are Hig for Each Task
Lumen Fitzmeyer &
Studios Tecci

VHB Halvorson Hi Tumer TOTALS

Phase 2 - Schematic Design (Preliminary Plans)

2.1 Schematic (P Plans}

244 Initiate Phase 2 $71,100!

2.12 Preliminary Design Plan development

Factory St. Extension Ped Access to
Pine Street

nofF St Extension $3

Parc de Renaissance and Water and $8,000. $57,500:
4 Water St Boardwalk $1,100.00
Renovation to Bicentennial Park - $0.00
53 Main St Cantilevered Boardwalk $1,800.06
Miulttuse Path $4,300.00
Substation $0.00
Boardwalk and Floa Dock $3,200.00
Trail $13,850
Riverbank Restoration $0.00

Cotton Transfer ADA $33,506.0

BAE Trail and Parking Modifications $13,000. §13,000.0

PanAm Ped Walkway Rehabilitation $30,370. §30,37

South Side Trail nts 00
ADA Ram $16,380
60 Main Street Boardwalk and Trail $10 $13,000.

Pearson Ave Alternative Connection : $0.00 $0.00

Preli ale : 0.00 $0,600
$15,000.00
to Final $0.00 $9.00
Utility Coordination $1,800.00 $1,800.00
Owner Coordination $1,500. $1,500.
Env, T:
Public & Stakeholder
Meeti eam and Staff)
Preliminary Cost
ement
hei cal Minor $3,000.00
Reimbursable Expenses {lf $1,000.00
Park Pavilion Architectural

PHASE 2 SUBTOTALS= | $189,300.00 000.00 I $41 0.00
5% SUBCONSULTANT ADMIN FEES (WAIVED)= $0.00

Other Expenses and Allowances:

Geotechnical for 2 Ped Ramp Structures: $18,000.00 $18,000.00
Geotechnical for In-Water Structures: $50,000.00 $50,000.00

Point Cloud Building Face Surveys: $7,000.00 $7,000.00

PanAm Inspection Vehicle: $3,500.00 $3,500.00

PanAm RR insurance {Allowance} $5,000.08 $5,000.00

Irrigation Design and Engineering: (DELETED) $0.06
Horticultural Soils Consultant: (DELETED} $0.00

TOTAL OF OTHER EXPENSES AND ALLOWANCES: $83,500.00

PHASE 2 TOTALS = $222,800.00 $89,700.00 $140,000.00 $3,000.00 $2,000.00 $500,000.60

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P106

Footer menu

  • Contact