who Design Services & Project Management of Downtown Riverfront Implementation
July 31, 2020
° Marine engineering
e Drainage studies, analysis, or design
e 3D visualizations
e Soils testing for hazardous materials
SCHEDULE
VHB proposes to complete the preliminary design phase in 3 months trom receiving noiice to
proceed. This schedule is dependent on receiving topographic survey files in a timely manner,
and is subject to extension due to delays by others in decision making, responsiveness or
reviews.
RIGHT TO RELY
lt ts understood that VHB will perform services under the sole direction of the City. The City shall
provide VHB with project-related technical data including, but not limited to, topographic and
right-of-way surveys, existing plans or studies, GIS data sets.
COMPENSATION
VHB and its subconsultants will perform the Scope of Services on a time and materials basis. The
estimated Upset Limit for this Scope of Services is $ 500,000. including labor, overhead, profit
and direct expenses. VHB direct expenses will be billed at their actual cost without markup and
subconsultants will be billed at their actual cost without markup.
VHB $ 189,300.00
Halvorson Design (ighe & Bond) § 89,700.00
H.L. Turner § 90,000.00
Lumen Design $ 3,000.00
Fitzmeyer & Tocci G 2,000.00
Geotechnical Services (Allowance) § 68,000.00
Point Cloud Building Survey (VHB) § 7,000.000
RR Bridge inspection Vehicle § 3,500.00
Railroad Insurance (Allowance) § 5,000.00
Touloukian & Touloukian Architects $ 42,500.00
PHASE 2 AMENDMENT TOTAL: $ 500,000.00
The execution of this amendment provides authorization for the services described above.