Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 8/11/2020 - P86

Board Of Aldermen - Agenda - 8/11/2020 - P86

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

at
Et

"
vhb Design Services & Project Management of Downtown Riverfront implamentation
October 31, 2018

Lead Consultant VHB
Support jrom:; Halverson, HE Turner

1.4.12 - Riverbank Restoration + New Access

This sub area will likely include enhancing the space between the paved trail and the
water's edge. VHB will examine potential improvements along the river's edge to enhance
aesthetics, improve visibility and access to the river, conduct bank stabilization, and
potentially treat stormwater. Thera may also be opportunities for small overlooks, and
selected locations for display of public art, signage and lighting. The City is currently
addressing the invasives problem in advance of this project, but there may be
opporiunities to modify the ground cover on the banks to mitigate invasives long term.

VHB will rely on guidance from HL Turner on floodplain elevations and restrictions on
filling,

Product: Include up to twa (2) design aliernatives including plans, tynical cross sections,
sketches and one (1) perspective as appropriate tc define the proposed improvements.
Lead Consultant: VHB

Support jrom: HL Turner, Halverson

1.4.13- ADA Accessible Ramp to Cotton Transfer Bridge

An ADA accessible bike/pedesirian ramp will be developed to connect the ground level
multiuse path up to the Cotton Transfer pedestrian bridge. The intent will be to utilize
similar design elements as the existing ADA ramp on the opposite side of the river. The
work will be done with consideration for avoiding impacts to the floodplain and tloodway.
VHB will complete the cesign with input from Halvorson and will coordinate with Lumen
Design Studio and Fitzemeyer & Tocci for lighting the structure. This project component
may be a good candidate for an accelerated schedule and “early success" assuming
environmental permitting will not hold it back.

Produci: Provide up to two (2) design alternatives including pians, sections and sketches as

appropriate to define the proposed improvements.

Lead Consultant: VAB
Support from: HL Turner, Lumen Design, Fitzemeyer & Tocci

=}

head

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P86

Footer menu

  • Contact