Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 8/11/2020 - P84

Board Of Aldermen - Agenda - 8/11/2020 - P84

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
84
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

nb Design Services & Project Management of Downtown Riverfront Implementation
October 31, 2015

1.4.7 - New Cantilevered Boardwalk:

This important sub area includes the exploration of a new cantilevered boardwalk that
would connect Main Street to the existing trail in area 9. The expectation is that the
boardwalk structure would be similar to the existing cantilevered boardwalk at the
Peddler’s Daughter building, If determined feasible, this element would be advanced
through design. if determined infeasible, this elament would be removed and possibly
replaced by pecesitrian enhancements in sub-area 8.

Due diligence efforts by HL Turner during this first phase will include interior and exterior
building inspections to determine the potential for attaching the cantilevered boardwalk to
the building.

Product: Plans, sections, sketches and precedent images as appropriate to define the
proposed improvements.

Lead Consultant: HL Turner
Support from: Halvorson, VHB, Lumen Design Studio, Fitzemeyer & Tocci

1.4.8 - Mulipurpese Path adjacent to Railroad

The potential to introduce a multipurpose path area adjacent to the existing Railroad to
provide a formal multimodal connection to Main Street by Riverside Barbeque Company
will be studied in this sub-area if it appears thet the cantilevered boardwalk in the above
section will not be feasible. This stucly will explore an accessible route from Main Street,
paralleling the tracks heading east towards the parking lot and existing trail. This would
likely involve redefining the paved surfaces to clearly demarcate the multiuse path apart
irom the railroad track, relying on obtaining rights to do so. If determined io be feasible,
this would be advanced through design development only if it is determined that the
cantilevered boardwaik alternative is not feasible.

Product: Provide plans, typical crass sections, and sketches as appropriate to define the
proposed improvernenis.

Lead Consultant: VHB
Support from: Halvorson

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P84

Footer menu

  • Contact