Exhibit °C July 30, 2020
ASSUMPTIONS CLARIFICATIONS
NASHUA PUBLIC HEALTH
DIVISION 8 (DOORS, FRAMES & HARDWARE):
Includes: 27 new Hollow metals frames
Incluces: 12 new steel doors
Includes: 56 new wood doors
DIVISION 8 (GLASS & GLAZING):
Includes: 3 new bullet resistant transaction windows
new Pella Lifestyle series window with Integral blinds. The blinds are manufacturered
Includes: out of the country and will be delayed. Pella will install the blinds once they come in,
which could be after occupancy.
DIVISION 9 (DRYWALL):
Includes: $10,000.00 Allowance for Patching
DIVISION 9 (ACOUSTICAL CEILING TILES}:
DIVISION 3 (FLOORING):
Includes: $10,000.00 allowance for floor prep
DIVISION 3 (PAINTING):
Exciudes: Finishes at window sashes
Excludes: Painting new wood doors, they come prefinished with clear coat
DIVISION 10 {SPECIALITES}:
includes: 5 feminine napkin disposals in bathrooms, not shown in drawings
Includes: Metal wrap for 2 columns outside rear entrance
Includes: New raised letter sign on exterior canopy over rear entrance
Excludes: Projection screen in conference room. Supplied and installed by owner
DIVISION £4 {EQUIPMENT}:
Excludes: All equipment; to be supplied and installed by owner
DIVISION 12 (FURNISHINGS):
Not applicable - no scope
DIVISION 14 (CONVEYING EQUIPMENT):
Includes: Single phase Hydraulic machine room less elevator
DIVISION 21 (EFRE SUPPRESSION):
Includes: New wet / dry sprinkler systems
7/30/2020