Exhibit °C July 30, 2020
ASSUMPTIONS CLARIFICATIONS
NASHUA PUBLIC HEALTH
utility company charges and backcharges. We exclude costs related to power
Excludes: consumption as a result of the construction process
Excludes: utility company charges and backcharges if required to raise or cover power lines for
lifts to be used to do work around the exterior of the building
Excludes: Future Tariffs imposed that affect costs of materials for the duration of this project
DIVISION 2 {DEMOLITION}:
Abatement of all asbestos items requiring removal per the survey provided by RPF
includes: .
Environmental
includes: Trash chute
Adding ice and water shield after abatement and before new roof is installed to keep
Includes: . .
it weather tight.
Excludes: removal and disposal of hazardous materials found not listed in the survey
DIVISION 3 (CONCRETE):
DIVISION 4 (MASONRY):
DIVISION 5 (METALS):
Includes: $800.00 Allowance for roof deck infill and support angles at old roof hatch location
includes: $2,000.00 Allowance for fixing fire escape railings
Excludes: New Exterior swing gate. Keep existing
DIVISION 6 (ROUGH CARPENTY):
DIVISION 6 (MILLWORK/FINISH CARPENTRY):
Includes: New vanity in Large exam room, instead of modifying existing
includes: reinstall & modification of cabinets and countertops in both labs
Includes: New Solid surface desk and 4 drawer cabinet in Nurses office
Excludes: Wire shelving, closet shelving and rods, as well as any shelving in storage rooms
DIVISION 7 (INSULATION, FIREPROOFING, FIRESTOPPING, SEALANTS & WATERPROOFING):
DIVISION 7 (ROOFING):
includes: 0.080 thick TPO roof with 30 year warranty
DIVISION 7 (SIDING):
Not Applicable - no scope
7/30/2020