sienna Nashua Public Health
CONTRACT 18 Mulberry Street
DOCUMENTS Nashua, NH
July 30, 2020
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
4.01 DIVISION 06 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0110 - Table of Contents
B. 003100 - Available Project information
SPECIFICATIONS
2.01 DIVISION 01 -- GENERAL REQUIREMENTS
A. 07 1000 - Summary
Of 3329 - Sustainable Design Reporting
01 4000 - Quality Requirements
07 4100 - Regulatory Requirements
01 4533 - Code-Required Special Inspections
01 5000 - Temporary Facilities and Controls
071 6000 - Product Requirements
01 6116 - Volatile Organic Compound (VOC) Content Restrictions
Ot 7000 - Execution and Closeout Requirements
01 7419 - Construction Waste Management and Disposal
01 7800 - Closeout Submittals
01 9113 - General Commissioning Requirements
01 9174 - Commissioning Authority Responsibilities
2.02 DIVISION 02 -- EXISTING CONDITIONS
A. 02 4100 - Demolition
B. 02 6500 - Underground Storage Tank Removal
2.03 DIVISION 03 -- CONCRETE
A. 03 3000 - Cast-in-Place Concrete
2.44 DIVISION 04 -- MASONRY
2.95 DIVISION 05 -- METALS
A. 05 1200 - Siructural Steel Framing
05 2100 - Siee!l Joist Framing
05 4000 - Cold-Formed Metal Framing
05 5000 - Metal Fabrications
05 5133 - Metal Ladders
F. 05 5213 - Pipe and Tube Railings
2.06 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 1000 - Rough Carpentry
B. 06 2000 - Finish Carpentry
2.07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 0150.19 - Preparation for Re-Roofing
B. 7 1300 - Sheet Waterproofing
C. 07 2100 - Thermal Insulation
rAcST TammMoo w
=
mu © ow
Nashua Public Health 00 0710-4 TABLE OF CONTENTS