[X] Not later than three hundred and twenty (320 ) calendar days from the date of commencement of the
Work.
i ] By the following date:
§ A.23.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are
to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial
Completion of such portions by the following dates:
Portion of Work Substantial Completion Date
None
§ 4.2.3.3 ifthe Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated
damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement,
ARTICLE A3 INFORMATION UPON WHICH AMENDMENT IS BASED
§ 4.3.1 The Guaranteed Meximum Price and Contract Time set forth in this Amendment are based on the Contract
Deacuments and ihe following:
§ ASL The following Suppiementary and other Conditions of the Contract:
Document Title Date Pages
§ A.3,1.2 The following Specifications:
(Either list the Specifications here, or refer to an exhibit attached to this Amendment.)
See Exhibit A
Section Title Date Pages
§ A313 The following Drawings:
(Gither list the Drawings here, or refer to an exhibit attached to this Amendment.)
See Exhibit A
Number Title Date
§ 43.1.4 The Sustainability Plan, ifany:
Gf the Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents that
comprise the Sustainability Plan by title, date and number of pages, and include other identifping information, The
Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures;
implementation strategies selected to achieve the Sustainable Measures; the Owner's and Construction Manager's roles
and responsibilities associated with achieving the Sustainable Measures; the specific details about design reviews, testing
or metrics to verify achievement of each Sustainable Measure; and the Sustainability Documentation required for the
Project, as those terms are defined in Exhibit C to the Agreement.)
Title Date Pages
None
Other identifying information:
§ A3.1.5 Allowances, if any, included in the Guaranteed Maximum Price:
(identify each allowance.)
AiA Document 4133* — 2079 Exhibit A. Copyright @ 19971, 2003, 2008, and 2078 by The American Institute of Architects. All rights reserved. ‘fhe “American
Init, instituie of Architects,” “AIA,” the AIA Loge, and "AIA Contract Documents” are ragisiared tadamaris and may noi be used without parmission. This document was 3
produced by AJA software at 15:44:10 ET on 07/30/2020 under Order No.3340517677 which expires on 03/24/2021, is not for resale, is licensed for one-time use
i only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, @-mail copyright@aia.org.
User Notes: (2053272627)