(S 2,825,625.08 ), subject to additions and deductions by Change Order as provided in the Contract Documents.
§ At4.2emized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the
Guaranteed Maximum Price organized by trade categories, including allowances; the Construction Manager’s
contingency; altemstes; the Construction Manager’s Fee; and other items that comprise the Guaranteed Maximum Price
as deftmed in Section 3.2.1 of the Agreement.
(Provide itemized statement below or reference an attachment)
See Exhibit E, Schedule of Values
§ 4.1.1.3 The Construction Manager’s Fee is set forth in Section 6.1.2 of the Agreement.
§ Ad1.4 The method of adjustment of the Construction Manager’s Fee for changes in the Work is set forth in Section
6.1.3 of the Agreement.
§ 41.4.5 Alternates
8 AA4.6.1 Alternates, ifany, included in the Guaranteed Maximum Price:
ffem Price
Nove
§ A.1.1.5.2 Subject to the conditions noted below, the following altemates may be accepted by the Owner following
execution of this Exhibit A: Upon acceptance, the Owner shall issue a Modification to the Agreement,
(lnsert below each alternate and the conditions that must be met for the Ovner to accept the alternate.)
liem Price Conditions for Acceptance
None
§ A.1.1.6 Unit prices, if any:
(identify the itent and state the unit price and quantity limitations, if any, to which the unit price will be applicable.)
Hemi Units and Limitations Price par Unit (50.00)
None
ARTICLE 4.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
§ A.2.1 The date of commencement of the Work shall be:
(Check one of the following boxes.)
[ ] The date of execution of this Amendment.
[X] Established as follows:
(insert a date or a means to determine the date af commencement of the Werk)
| Anticipated date of September 8, 2020
Ifa date of commencement of the Work is not selected, then the date of commencement shall be the date of execution of
this Amendment.
§ A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in
the Contract Documents for Substantial Completion of the Work. The Contract Time shali be measured from the date of
commencement of the Work.
§ A.2Z.3 Substantial Completion
§ A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager
shall achieve Substantial Completion of the entire Work:
(Check one of the following boxes and complete the necessary information.)
fim Doctiment A133” — 2075 Exhibit A, Copyright © 1957, 2003, 2009, and 2079 by The American institute of Architects, Ali righis reserved. The “Amencan
Init. institute of Architacis,” “Al4s,° tha AIA Logo, and “AIA Contraol Documenis" are ragigtered trademarks and may not bs used without permission. This document was 9
produced by AIA software at 15:41:10 ET on 07/30/2020 under Order No.3340517677 which expires on 03/24/2021, is not for resale, is licensed for one-time use
i only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.ore.
User Notes: (2053272627)