Project Specific Information
This Exhibit is part of the Contractor’s Qualification Statement, submitted by Schroeder
Construction Management Inc and dated the third day of November in the year Two
Thousand Twenty-one
PROJECT:
IFB0779-1 10321 Waste Line Replacement at the Transit Administration Building
[1 Riverside Street
Nashua, NH 03062
CONTRACTOR'S PROJECT OFFICE:
2 Townsend West, Unit #3, Nashua, NH 03063
TYPE OF WORK SOUGHT
This project is for the removal of an existing underground sewer line inside an existing
building that is occupied. We will perform this work as a general contractor/construction
manager. The work will be design build with a drawing prepared by a mechanical engineer.
We will subcontract the plumbing design and plumbing work on this project. Finish
flooring will also be sublet
CONFLICT OF INTEREST
Describe any conflict of interest your organization, its parent, or a subsidiary, affiliate, or
other entity having common ownership or management, or any of the individuals listed in
Exhibit A Section 1.2, may have regarding this Project.
None
§ C.1 PERFORMANCE OF THE WORK
§ C.1.1 When was the Contractor’s Project Office established?
The Office of Schroeder Construction Management Inc. was established in 2005, Our
current office was occupied by SCMI at 2 Townsend West, Unit 3 in 2016
§ €.1.2 How many full-time field and office staff are respectively employed at the
Contractor’s Project Office?
§ €.1.3 List the business license and contractor license or registration numbers for the
Contractor’s Project Office that pertain to the Project.
State of New Hampshire, Massachusetts, Maine, Vermont -Construction Management &
General Contractor
ATA. document 4305" - 2020 Exhibit C
ADDITIONS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may also
have revised the text of the original
AIA standard form. An Additions and
Delelions Reporl that notes added
information as well as revisions to the
standard form text is available from
the author and should be reviewed, A
vertical line in the left margin of this
document indicates where the author
has added necessary information
and where the author has added to or
deleted from the original AIA text.
This document has important legal
consequences, Consultation with an
attorney is encouraged with respect
to its completion or modification.
AIA Document A305" = 2020 Exhibit C. Copyright © 2020 by The American Instilute of Architects. All rights reserved. The ‘American Instilule of Archilects,”
“AIA,” Ihe AIA Logo, and “AIA, Contract Documents’ are registered trademarks and may nol be used wilhoul permission, This document was produced by AIA
software al 12:05:43 ET on 11/03/2021 under Order No.4399661920 which expires on 03/30/2022, is not for resale, is licensed for one-time use only, and may only
be used in accordance with the AIA Contract Documents® Terms of Service, To report copyrigh! violations, e-mail copyrigh|@ala.arg.
User Notes:
(1987008615)
1