Date: January 6, 2022
To: Jim Donchess, Mayor; Finance Committee
From: Camille Correa, Transit Administrator
Re: — Contract with Schroeder for the Waste Line Project at NTS Administration building
located at 11 Riverside St.
Request:
NTS is requesting the Finance Committee to approve a grant funded contract with Schroeder
Construction Management in the amount of $98,366 to perform the replacement of the Waste
Line and Building Repairs at the Nashua Transit Administration Building located at 11
Riverside, Nashua, NH 03062.
Background:
On September 13, 2021 NTS solicited proposals from qualified vendors for the Sewer
Replacement & Building Repairs project located at the Nashua Transit Administration
Building, 11 Riverside Street, Nashua, NH 03062. NTS received one bid from Schroeder
Construction Management, Inc.
Project Scope of Work includes the replacement of the 4” cast iron waste piping from the
interior bathrooms to the exterior sewer connection, the replacement of cast iron waste piping
connecting the water closets, urinal and lavatories to the main waste line with PVC piping and
to reconnect to existing venting. The work is intended to be completed without impacting
interior wall structures except for sheetrock replacement as needed. As part of this contract the
flooring tile in the construction area will be replaced.
Request Amount: $98,366
