Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 9/9/2020 - P273

Board Of Aldermen - Agenda - 9/9/2020 - P273

By dnadmin on Sun, 11/06/2022 - 23:04
Document Date
Fri, 09/04/2020 - 12:48
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 09/09/2020 - 00:00
Page Number
273
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__090920…

@ Vanasse Hangen Brustlin, Inc.

o / i ® Park Street Sey
=? a a °e
= -* ae = we,
=o oe f 2 ee.
gr &
SN g a>
: ~.
Factory Sireot Cote 6 Aye e
qs = - = ~.
7
3 & ten f
&
High Street + = tr .
t 3 90 9g
{ Schobl Stree: = - ee
C =
W, Pearl Street = = A cab he
} LU : E- 92 af
a Hosmer Ave = & a 2 =|
Cedar Suna . . } be 2 & = A) |
Pleasent Street Eldridge Street f a ee ee
4 { ( sty 3 — g Foundry Streal
3 . 5 = in o
é ye CS :
7 fhe Sees
: s FS
"6 g5 8

Figure 20: Factory St/T: em ple St and East and West Pearl Street Reverse One-way Alternative

This conversion to reverse flow along the entire length of the Factory /Temple Streets
and West/East Pearl Streets would be relatively straight forward due to the existing
cross section. No modifications to the roadway width would be required. Only the
roadway striping would need to be modified to reflect the change in flow. However,
the traffic control at all of the intersections would need to be modified to reverse
conditions. Both traffic signals on Main Street would need to be modified including
signal head placement, phasing and timing. The many unsignalized intersections
would also need modification including Water Street, Walnut Street, Elm Street,
Spring Street, Cottage Street, Quincy Street Holmes Street Mason Street, White
Avenue, and South Street. These changes would be mostly confined to modifying

signage and striping.

Table 7 - Signalized Intersection Capacity Analysis Summary

Existing 1-Way Reverse 1-Way Alternative
v/c* Delay** LOS*** v/c Delay LOS
Main St. at Factory/Temple St. AM _ 0.38 16 B 0.55 16 B
PM 0.46 26 C 0.54 19 B
Main St. at East/West PearlSt. AM 0.50 21 C 0.37 16 B
PM 0.47 22 C 0.42 22 G
* Volume to Capacity Ratio.
** Delay in seconds per vehicle.
*** Level of Service.
si alean Crasher Gon 37 Alternatives Evaluation

Circulation Studyireports\Final ReporfiFinal
ReporLdocx

Page Image
Board Of Aldermen - Agenda - 9/9/2020 - P273

Footer menu

  • Contact