Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 9/9/2020 - P166

Board Of Aldermen - Agenda - 9/9/2020 - P166

By dnadmin on Sun, 11/06/2022 - 23:03
Document Date
Fri, 09/04/2020 - 12:48
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Wed, 09/09/2020 - 00:00
Page Number
166
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__090920…

UREAN

DESIGN ASSOCIATES

nections

* not a Downtown bypass

The Master Plan recommends the Broad
Street Parkway connect to Franklin
Street as well as the Millyard. This align-
ment will route through-traffic directly
across Railroad Square, thereby alleviat-
ing the cumbersome dogleg movement

that currently exists.

Nashua Downtown Master Plan

In addition, and equally important, 40
the Broad Street Parkway will have a
small, two-lane bridge providing direct
access to the Millyard. The bridge con-
nection will link into an extension of
Pine Street which in turn will provide
access to Downtown via Central Street.
This bridge connection will also provide
a trail crossing from one side of the
Nashua River to the other. (Additional

goes a

pos
mnt

or -
Ea

ite

Broad Street
Parkway

The preferred
alternative for the
Broad Street Parkway
(left) will provide access
to redevelopment
opportunities, as well as
reduce congestion at

Railroad Square.

Recommended cross-
section (section A-A}

(top left)

Recommended cross-

section at the new

bridge (section B-B)
(top right)

Page Image
Board Of Aldermen - Agenda - 9/9/2020 - P166

Footer menu

  • Contact